Bathroom design and fit out
December 7, 2016
Hotel bathroom rip out and install
December 6, 2016

Cafe kitchen and shop fit out

  • TaskRip out old bathroom, design and install a new one

One of our client recently purchased a cafe that resides on a very busy high street and asked QC Construction Group to fit a new kitchen and shop front.

We ripped up the old floor, plastered the old walls – installed worktops, cupboards, painted and decorated and tiled.

The results are outstanding. Take a look at our gallery below:

Our Gallery - click a picture to view larger gallery: